The works at Shoreham Health Centre included primary mechanical and electrical plant and distribution as follows:
- Boiler House Refurbishment
- Replacement heating circuit to reception and waiting areas
- Replacement switchgear and sub-mains
The boiler House refurbishment includes a three boiler cascade system which replaced 2 no. cast iron Robin Hood boilers. The pipework arrangement includes traditional headers with primary and secondary pumping arrangements plus plate heat exchanger serving 1 no. variable temperature circuit serving existing heat emitters and 1 no. constant temperature circuit serving new ceiling mounted fan convectors in the reception and waiting areas. It also includes new pressurisation arrangements and dosing pots.
![](https://mjgservices.co.uk/wp-content/uploads/2022/03/Shoreham-Health-Centre-1.png)
![](https://mjgservices.co.uk/wp-content/uploads/2022/03/Shoreham-Health-Centre-2.png)
The electrical services works incorporated the replacement and relocation of the existing water damaged age expired loose LV Switchgear with a new panel board located in the boiler house with new sub-mains distribution to replacement distribution boards and major load centres such as the BMS Control panel, lifts and packaged water booster set.
![](https://mjgservices.co.uk/wp-content/uploads/2022/03/Shoreham-Health-Centre-3.png)
![](https://mjgservices.co.uk/wp-content/uploads/2022/03/Shoreham-Health-Centre-4.png)
![](https://mjgservices.co.uk/wp-content/uploads/2022/03/Shoreham-Health-Centre-5.png)